Projects notified ex-ante
2019
Project name: Engineering works and supply of equipment for Orion Power Unit-2 Coal based Thermal Power Plant in Dhaka, Bangladesh.
Location: Dhaka, Munshiganj District, Bangladesh.
Project description: Engineering works and supply of equipment for Orion Power Unit-2 Coal based Thermal Power Plant with net output of 635 MW built by Orion Power Unit-2 Dhaka Limited
Documents provided for environmental and social impact review:
- Questionnaire on environmental and social impacts of the Project
- Environmental Impact Assessment Study (ESIA Report) prepared by AECOM India Private Limited, signed January, 2018
- Socio-Economic Environment Study prepared by Adroit Environment Consultants Ltd (AECL), signed October, 2016
International Standards applied:
- IFC Performance Standards:
- Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impacts
- Performance Standard 2: Labor and Working Conditions
- Performance Standard 3: Resource Efficiency and Pollution Prevention
- Performance Standard 4: Community Health, Safety and Security
- Performance Standard 5: Land Acquisition and Involuntary Resettlement
- Performance Standard 6: Biodiversity Conservation and Sustainable Management of Living Natural Resources
IFC Environmental Health and Safety (EHS) Guidelines:
- General EHS Guidelines
- EHS Guidelines for Thermal Power Plants
Category A project
The information was made public on 20.09.2019.
2016
Project: Supply of mining equipment to Amasra B Coal Mine Project in Turkey
Location: Amasra District of Bartin Province, West Blacksea Region, Turkey.
Project description: Supply of mining equipment, including four longwalls, belt conveyors, chain conveyors, TH profiles and attachment sets to Amasra B Coal Mine Project in Turkey
Documents provided for environmental and social impact review:
- Questionnaires on environmental and social impacts dated 28.05.2015, 14.07.2015 and 17.08.2015
- Environmental and Social Impact Assessment Report (ESIA Report), signed by ELC Group (a company of Royal HaskoningDHV), Istanbul, Turkey, received 19.06.2015 (draft) and 11.09.2015 (final draft)
International Standards applied:
IFC Performance Standards:
- Performance Standard 1: Social and Environmental Assessment and Management Systems
- Performance Standard 2: Labor and Working Conditions
- Performance Standard 3: Pollution Prevention and Abatement
- Performance Standard 4: Community Health, Safety and Security
- Performance Standard 5: Land Acquisition and Involuntary Resettlement
- Performance Standard 6: Biodiversity Conservation and Sustainable Natural Resource Management
- Performance Standard 8: Cultural Heritage
IFC Environmental Health and Safety (EHS) Guidelines:
- General EHS Guidelines
- Industry Sector Guidelines:
- IFC EHS Guidelines for Mining
Category A project
The information was made public on 19.05.2016.
2014
Project: Construction of a duck farm in Ukraine
Location: Evmynka village, Kozeletskyi District, Chernigiv Region, Ukraine
Project description: Construction of a duck farm in Ukraine (1st stage) with planned capacity of 864 thousands of ducks and planned production in amount of 5,4 m ducks per year
Documents provided for environmental and social impact review:
- Questionnaire on environmental and social impacts dated 8.11.2013
- Environmental impact assessment report, signed by LLC Interproject GMBH, Kiev, received 30.01.2014
- Additional explanations and documents obtained from investor 31.12.2013, 22.01.2014, 30.01.2014
International standards applied in benchmarking process:
IPC Performance Standards:
- Performance Standard 1: Assessment and Management of Environmental and Social Risks and Impacts
- Performance Standard 2: Labor and Working Conditions
- Performance Standard 3: Resource Efficiency and Pollution Prevention
Environmental Health and Safety (EHS) Guidelines:
- General EHS Guidelines
- Industry Sector Guidelines:
- Environmental, Health, and Safety Guidelines for Poultry Production
- Environmental, Health, and Safety Guidelines for Poultry Processing
Information made public on 31.01.2014.
2008
Project: The mining and production complex of construction aggregate with a port
Description and location: Construction of a mining and production complex of construction aggregate with a port (embankments, loading equipment, a site for storing of aggregate) in Republic of Karelia, Russian Federation.
Download: Environmental Impact Assessment Report www.wiedemann.com.pl/karelia
Information made public on 3.03.2008.
2007
Project: Construction of a power plant in Macedonia
Environmental Assessment Report available for download below.
More information is also available on the Euler Hermes website.
Information made public on 31.10.2007.